Project Overview
Samah Co. is proud to have partnered with TechnipFMC to execute the FMC GEMINIS Machine Foundations Project. This endeavor highlights our commitment to delivering state-of-the-art construction and engineering solutions that meet the most demanding industrial standards. The project encompassed a wide range of technical and civil activities, all meticulously planned and executed to ensure the foundations were robust, vibration-resistant, and compliant with the operational requirements of the FMC GEMINIS machinery.
Our team utilized advanced construction techniques, high-quality materials, and strict quality control measures, including Field Density Testing (FDT) at critical stages, to deliver a durable and high-performance foundation.
Scope of Work Highlights:
1. Excavation and Groundwork:
a) Concrete Removal and Surface Preparation:
- Precision cutting of existing floor concrete using road-cutting machines.
- Breaking and removal of floor concrete with backhoe equipment (Boclain machine).
b) Excavation:
- Excavation to the required depth and dimensions using backhoe loaders, ensuring accuracy and adherence to design specifications.
- Backfilling with a 25 cm thick base course (Type A-1 material), compacted to ensure stability.
c) Field Density Testing (FDT):
- Conducted FDT tests during backfilling and compaction to ensure the base course met the required density and load-bearing capacity.
d) Soil Protection:
- Soil termite treatment applied beneath the slab-on-grade to protect against long-term deterioration.
2. Foundation Preparation:
a) Base Layer Installation:
- Placement of 300-micron polyethylene sheets as a moisture barrier.
- Pouring 2500 psi lean concrete to create a stable and even foundation base.
b) Structural Elements:
- Construction of concrete hollow block (CHB) walls as per project specifications.
3. Specialized Concrete Works:
a) High-Strength Concrete Pouring:
- Installation of steel formwork to precise design specifications.
- Pouring and curing of 5500 psi reinforced concrete, providing exceptional durability and stability for the machinery.
b) Vibration Resistance:
- Application of a 5 cm thick vibration-resistant material around the foundation, ensuring the machinery remains stable during operation.
4. Surface Protection and Coating:
a) Advanced Protective Layer:
- Application of a single layer of 100% pure polyurea spray coating, 1 mm thick, over the foundation surface to safeguard against environmental factors, wear, and corrosion.
Project Challenges & Achievements:
- Technical Expertise: Successfully managed complex technical requirements, including precision FDT testing, high-strength concrete works, and advanced coating applications.
- Client-Focused Execution: Tailored the project scope to meet TechnipFMC’s specific operational needs, ensuring quality, durability, and compliance with industrial standards.
- Efficient Resource Management: Delivered the project within the timeline by effectively coordinating materials, labor, and machinery while adhering to strict safety protocols.
Why This Project Stands Out:
The FMC GEMINIS Machine Foundations Project reflects Samah Contracting Co. ability to execute highly specialized engineering solutions with precision and reliability. The integration of advanced techniques, high-performance materials, and rigorous quality control measures, such as Field Density Testing (FDT), ensured a foundation capable of meeting the stringent demands of modern industrial machinery.
This project not only reinforces our reputation as a trusted partner for industrial and construction projects but also underscores our dedication to achieving excellence and exceeding client expectations.
Samah Co. supports Saudi Vision 2030, delivering sustainable construction solutions. Approved by the Saudi Contractors Authority and a Chamber of Commerce member, we align with the Kingdom’s development goals.